New Mexico well record

MORGAN A FEDERAL #004

Roosevelt County | Sec 27, T07S, R33E, Unit K | CASING REPAIR 09/29/009

ProducingAPI 3004110415Operator 4378O
CountyRoosevelt County
FieldCASING REPAIR 09/29/009
Documents0
Latest activityDrilling progress reported
First productionNot reported
Recent productionDec 2025
Well context

Known public record details

API number3004110415
CountyRoosevelt County
OperatorOperator 4378
FieldCASING REPAIR 09/29/009
LeaseMORGAN A FEDERAL #004
Well number004
OCD statusProducing | source A
Well typeO
Location

Location summary

Roosevelt County | Sec 27, T07S, R33E, Unit K | CASING REPAIR 09/29/009

SurveyT07S R33E
Section27
TownshipT07S
RangeR33E
OCD unitK
Footage1980' S, 1980' W
Latitude33.676523
Longitude-103.555218
Depth profile

Depth and dates

Target depth4,426 ft
TVD4,426 ft
MVD4,426 ft
Ground elevation99,999 ft
Latest event dateFeb 4, 1966
Latest event typeDrilling progress reported
Production

C-115 production

Most recent monthDec 2025
Months reported1
Cumulative oil58,208 bbl
Cumulative gas152,492 Mcf
Last 12m oil0 bbl
Last 12m gas0 Mcf

Loading monthly C-115 rows...

Activity

Recent activity timeline

C-115 production reported for Dec 2025

OCD C-115 rollups show production associated with this API.

Production reportednew_mexico_ocd_wellhistory
Documents

Recent New Mexico source documents

No scanned source documents are linked to this New Mexico public well card yet. Production activity may still be present from structured monthly production records.

Lifecycle

Well lifecycle timeline

C-101 permit to drill
Linked signal found

C-101 and APD records can indicate requested drilling, re-entry, deepening, or related work, but do not guarantee drilling, completion, or production.

C-102 acreage dedication plat
No linked signal yet

C-102 plats and location records help place a New Mexico well in its section, township, range, unit, pool, and spacing context.

C-104 allowable and transport
No linked signal yet

C-104 records can appear as a well moves from drilling and completion context toward authorization to transport production.

C-105 completion report
No linked signal yet

C-105 completion or recompletion records can show that a well moved beyond permit status into a completed well record.

C-115 monthly production
Linked signal found

C-115 rows are recurring production reports and help identify wells with linked monthly oil, gas, water, or reported zero-volume records.

C-103 sundry or plugging notice
No linked signal yet

C-103 sundry and plugging-related records are late-life or status-change signals. Treat them as verification leads, not the preferred starting point for active-well discovery.

Beta access

Explore New Mexico well activity in the beta workspace.

Future Wells New Mexico is currently in beta. Data coverage, search tools, and map layers are actively being expanded and verified.

Create Free Beta Account